Hopper Condominium Association Block 4104 Lot 3
- 05.21.20 Cover letter - conklin Assoc
- Retaining Wall Replacement plans revised to 8/10/20 (1,2,3,4,5,6,7,8)
- Hopper Ridge Townhomes Final Site Plan 1990
- Hopper Ridge Crib Wall Location 1983
- Hopper Ridge Townhomes Drainage Area Map 1982
- Photos
- Original Landscape Plan rev. 1.11.83
- Hopper Ridge, Major Subdivision Filed Map 8131
- Cedar Hill Homes Inc. Filed Map 4610
- 1983 PB Resolution- Final Subdivision & Prelim Site Plan approval
- 1990 PB Resolution – Final Site Plan approval
- Design Standards – Retaining Wall replacement
- Johnson Soils Geotech report, 1.08.20
- Design Calculations for max wall height
- 07.20.17 Correspondence to PB
- 07.25.17 B. Bogart completeness memo
- 09.12.17 minutes from meeting with VOR professionals
- 02.07.17 minutes from meeting with VOR Engineering Dept.
- Soil Movement Quantity Summary
- Stage Storage Summary On-Stream Detention Basins
- Site Plan Waiver application to BCPB
- Application to BC Soil Conservation District
- BC Soil Conservation District- Plan Approval 09.23.20
- 6-7-17 Minutes of NJDEP Meeting
- 10.06.20 Hopper Ridgewood transcript 1
- 11.03.20 Hopper Ridgewood transcript 2
- Hopper Ridge application(Added 12/29/2020)
- Hopper Ridge Condominium Assoc. – Amended Site Plan Application Summary
- Hits: 776